Array Cable Monitoring System

Array Cable Monitoring System

March 22, 2021

Case-study-Array-Cable-Monitoring-System

Dynamic Load Monitoring (UK) Ltd were approached by Subsea Innovation to develop a monitoring system, which was able to gather information on the stresses and movement experienced by array cables interconnecting the Wind Turbines on London Array wind farm off of the coast of Kent in the UK.

Our case studies

Long Line Cutter

DLM’s Long Line Cutter: Protecting Subsea Cables

Posted on October 3, 2024

The Long Line Cutter has become an essential part of any cable-laying project toolkit, and we now keep limited stock at DLM HQ.

Read more

Saddleback Holdback Tensioner for Subsea Cable

Posted on January 7, 2022

Dynamic Load Monitoring (UK) Ltd. (DLM), of Southampton, UK has expanded its already extensive range of line tension measurement technology, with a new device for…

Read more

Six point Winch Monitoring System

Posted on January 6, 2017

A large offshore cable-laying company approached DLM to design a Winch Monitoring System to enable them to measure the line tension on the Winch cables…

Read more
View all case studies