Famous Bridge Refurbishment uses DLM Load Cell

January 3, 2017

Hampshire Rigging Services used a DLM load cell to measure tension on a historical suspension bridge wire rope during refurbishment in Thames Ditton last month.

Hampshire Rigging who regularly use DLM Load cells due to their great customer service and rapid response on hire items contacted the firm in need of a 12t telemetry tensile link in order to measure the tension on the steel wire rope of an old bridge in Thames Ditton, Hampshire.

The beautiful 1939 suspension bridge located on the River Thames, leads across to an inhabited island in the middle of the river adjacent to Hampton Court Palace where Henry VIII once lived. The once wooden bridge first opened in 1753 and had a toll collected by a bridge-keeper. It has since been replaced three times to the existing suspension bridge we see today. Due to general wear of the bridge it was decided that the wire ropes would be replaced and the bridge would be refurbished. One of DLM’s TL-2.0 12t Telemetry Tensile Links will be rigged in line at the base of the bridge and will be used to measure the applied tension during replacement of the wire rope. The load values can be seen on a wireless hand held display up to 200m from the load cell allowing the operator to be mobile while still monitoring tension.

Martin Halford, Managing Director at Dynamic Load Monitoring commented : ‘Using a Tensile Link Load Cell to measure the tension in a wire rope is something our load cells have been used for many times, but it is fantastic to see one of our TL-2.0 Tensile Links in use on such a structure steeped in history. The refurbishment work being undertaken by Hampshire Rigging is very innovative in its approach and has allowed for the bridge to remain open to the public through the work, a testament to their expertise’.

If you are interested in one of our tensile links or would like a quote from DLM, please contact sales@dlm-uk.com.

Latest news

Stingray

DLM Launches Stingray Acoustic Positioning Grapnel

Posted on March 19, 2025

Dynamic Load Monitoring (UK) Ltd. (DLM), of Southampton, UK has launched a new Acoustic Positioning Grapnel — the Stingray — that sends a signal to…

Read more
DLM JOSCAR

DLM Receives JOSCAR Approval

Posted on December 18, 2024

Dynamic Load Monitoring (UK) Ltd. (DLM) has joined the Joint Supply Chain Accreditation Register (JOSCAR), which means it is approved to work on aerospace, defence,…

Read more

2024 Christmas Closure

Posted on December 9, 2024

Please note that our offices will be closed from 12:30 PM on Tuesday, 24th December 2024, and will reopen at 8:30 AM on Thursday, 2nd…

Read more
View all articles